Roofing software from the first inspection to the final payment
Measured estimates from your own material costs, crews scheduled around the weather, and money collected at deposit, delivery and completion.
One crew free forever · No card to start
What it costs today
Estimates are rebuilt from scratch every time
Squares, waste factor, underlayment, flashing and disposal, reassembled by hand for each roof, with a different margin each time.
Material deliveries and crews miss each other
The load arrives a day after the crew, or the crew arrives at a house with no load, and a day is gone.
Cash arrives after the job is over
Materials are paid for weeks before the customer pays, and nobody is tracking the gap job by job.
Built for roofing
The parts of the job your software usually ignores
Assembly-based estimating
Price by square from assemblies that carry their own material, labour and waste, so a change in shingle cost updates every future estimate at once.
Material orders tied to the job
Generate the order from the accepted estimate, schedule the delivery as its own dated event, and see the difference between ordered and consumed.
Weather-aware scheduling
Move a crew's day and everything downstream moves with it: deliveries, inspections, the customer's notification.
Insurance and supplement tracking
Claim number, adjuster, scope and supplements recorded on the job, with approved and unapproved amounts kept separate.
Deposit, delivery, completion billing
Three invoices, three payment links, all against one job, all reconciled to the same client record.
Photo documentation that survives
Before, during and after photos attached to the job and the site, with timestamps, for the warranty conversation two years from now.
How a job runs
Four steps, one record
- 1
Inspect and measure
Capture the roof, the photos and the conditions on the phone. The inspection becomes the basis of the estimate.
- 2
Estimate from assemblies
Pick the system, set the waste factor, and the price comes from your current material and labour costs.
- 3
Schedule the crew and the load together
Delivery and tear-off sit on the same board, so neither shows up alone.
- 4
Bill in phases
Deposit on signature, material draw on delivery, balance on completion. Each is collected on its own link.
Questions
Roofing, specifically
Still unanswered? The docs go deeper, and a reply from us is usually faster than a demo.
- Does it handle insurance work?
- Claim details, adjuster contacts, scope documents and supplements attach to the job, and approved versus outstanding amounts are tracked separately from the customer's own deductible.
- Can I use my own material pricing?
- Yes. Assemblies reference your material list and your labour rates, so updating a cost updates every estimate that uses it from that point on.
- What happens when weather pushes a crew?
- Move the visit and its dependent events move with it: delivery, inspection, follow-up. Affected customers are notified in the same action.
- Can subs be scheduled and paid through it?
- Subcontractor crews are scheduled like any other crew, and their cost is recorded against the job so job-level margin stays accurate.
Run your roofing work on one board.
Free for one crew, forever. Import your price book and book the first job today.