Skip to content
The operations board for roofing contractors

Roofing software from the first inspection to the final payment

Measured estimates from your own material costs, crews scheduled around the weather, and money collected at deposit, delivery and completion.

One crew free forever · No card to start

Schedule
Week3 crews
Mon 14
Tue 15
Wed 16
Thu 17
Fri 18
Crew A · Diaz
Sunrise Dental · PM service
Harbour Lofts · 14 units
Crew B · Whitfield
Ridgeway Plaza · retrofit
Callback · 22 Alder
Crew C · Osei
Northline Depot · install

What it costs today

01

Estimates are rebuilt from scratch every time

Squares, waste factor, underlayment, flashing and disposal, reassembled by hand for each roof, with a different margin each time.

02

Material deliveries and crews miss each other

The load arrives a day after the crew, or the crew arrives at a house with no load, and a day is gone.

03

Cash arrives after the job is over

Materials are paid for weeks before the customer pays, and nobody is tracking the gap job by job.

Built for roofing

The parts of the job your software usually ignores

Assembly-based estimating

Price by square from assemblies that carry their own material, labour and waste, so a change in shingle cost updates every future estimate at once.

Material orders tied to the job

Generate the order from the accepted estimate, schedule the delivery as its own dated event, and see the difference between ordered and consumed.

Weather-aware scheduling

Move a crew's day and everything downstream moves with it: deliveries, inspections, the customer's notification.

Insurance and supplement tracking

Claim number, adjuster, scope and supplements recorded on the job, with approved and unapproved amounts kept separate.

Deposit, delivery, completion billing

Three invoices, three payment links, all against one job, all reconciled to the same client record.

Photo documentation that survives

Before, during and after photos attached to the job and the site, with timestamps, for the warranty conversation two years from now.

How a job runs

Four steps, one record

  1. 1

    Inspect and measure

    Capture the roof, the photos and the conditions on the phone. The inspection becomes the basis of the estimate.

  2. 2

    Estimate from assemblies

    Pick the system, set the waste factor, and the price comes from your current material and labour costs.

  3. 3

    Schedule the crew and the load together

    Delivery and tear-off sit on the same board, so neither shows up alone.

  4. 4

    Bill in phases

    Deposit on signature, material draw on delivery, balance on completion. Each is collected on its own link.

Questions

Roofing, specifically

Still unanswered? The docs go deeper, and a reply from us is usually faster than a demo.

Does it handle insurance work?
Claim details, adjuster contacts, scope documents and supplements attach to the job, and approved versus outstanding amounts are tracked separately from the customer's own deductible.
Can I use my own material pricing?
Yes. Assemblies reference your material list and your labour rates, so updating a cost updates every estimate that uses it from that point on.
What happens when weather pushes a crew?
Move the visit and its dependent events move with it: delivery, inspection, follow-up. Affected customers are notified in the same action.
Can subs be scheduled and paid through it?
Subcontractor crews are scheduled like any other crew, and their cost is recorded against the job so job-level margin stays accurate.

Run your roofing work on one board.

Free for one crew, forever. Import your price book and book the first job today.